Hace 2 días
Process Engineer (Automation Engineer in USA)
Si el reclutador te contacta podrás conocer el sueldo
Sobre el empleo
Detalles
Contratación:
PermanenteHorario:
Tiempo completoEspacio de trabajo:
HíbridoDescripción
Are you ready to join a dynamic global gear technology group and be part of a company that promises to "wow your world"? IMS Gear, a leading producer of gear technologies for the automotive industry, is seeking a talented and motivated individual to join our team as a Automation Engineer (hands-on).
About IMS Gear:
With a history spanning over 160 years, IMS Gear has consistently grown, thanks to our customer-centric approach, problem-solving expertise, and an open corporate culture with flat hierarchies. Headquartered in Donaueschingen, Germany, we operate globally with a workforce of about 3,600 employees across Europe, North America, and Asia.
You support our team as
Process Engineer (Automation Controls Engineer)
Reports to: Business Unit Manager
We are currently seeking a skilled Process Engineer to join our team. The ideal candidate will be responsible for debug and failure identification along with problem resolution on automated assembly lines and various other injection molding and metal processing automations.
***Please submit your resume and application in English***
Job Type: Full-time, 08:00 am to 04:30pm
Work Location: In person (Gainesville, GA)
Responsibilities:
- Conduct machine and process capability studies and make improvements as needed
- Develop industrial communication connections between devices. System testing. Commissioning. Mechanical alignment of parts. PLC programmers
- Conduct complex commissioning / acceptance of equipment and machines
- Select released suppliers for indirect material, request and evaluate offers in coordination with supplier
- Define process parameters and ensure adherence
- Create and adapt work instructions
- Develop automation concepts, support process development for new projects, coordinate with Industrial Engineering and implement
- Carry out complex and constructive examinations on function, layout and design of machines and electrical installations (feasibility), select/modify components
- Develop and carry out the construction of smaller complex process solutions
- To program machine controls and teach robots
- Develop and implement measures for process optimization, initiate implementation incl. new partial process solutions and modification of manufacturing processes
- Participates in 8D problem-solving activities (internal/external), analyze complex alarms and remove root causes
- Keep automation maintenance history up to date and ensure exchange of information in SharePoint
- Support beyond BU-level in case of complex process changes and faults
- Determine root causes for complaints and develop corrective actions
- Plan spare parts requirements and initiate orders
- Introduce employees to installations, instruct them and create training material
- Supervision of interns and bachelor students
- Ensure compliance with guidelines and regulations (environment according ISO14001, compliance, work safety) with company and BU-standards.
- Initiate process improvement projects using data-driven and statistically designed experiments to enhance quality, reduce cost, enhance safety, and increase earnings
- Assists quality department to verify process parameters and monitor functionality of quality related devices
- On call when required
- Other duties as assigned
Education and Project Requirements:
- Bachelor's Degree in Engineering (Mechatronics Engineer, Electrical Engineer, Automation and Control Engineer, Mechanical Engineer Or Related.) and minimum 3+ years relevant work experience (automotive preferred)
- Current passport desirable (even better if you have an american tourist visa)
Skills Requirements:
- Manufacturing and IATF Standard experience preferred
- Technical writing and logical hands-on problem solving skills
- Ability to work in a team environment
- Self-driven and motivated to learn
- Commitment and responsibility.
- Teamwork.
- Ability to work under pressure.
- Capable at reading schematics (electrical, hydraulic, pneumatic)
- Computer Skills (MS Office)
Knowledge or experience with the following (desired):
- Siemens Step 7 classic
- Mitsubishi Scara
- Kuka Roboter KR C4
- Yaskawa
Some of your Benefits:
- Financial and legal Support in the management of the work visa process.
- Flight from Mexico City to final destination in the United States (depending on the location, the flight may be with a stopover) and vice versa.
- Lodging and transportation in the United States for the first 90 days of your project.
- 401 (k) & 401 (k) matching
- Health, Dental, Medical, Vision insurance
- Company Paid Life insurance
- Company Paid Short term and Long term disability insurance
- 15 business days of paid time-off and 10 paid holidays
Work Environment/Physical Demands:
- Exposure to manufacturing areas which require the use of personal protective equipment such as safety glasses, hearing protection and slip resistant safety toe shoes
IMS Gear is an equal opportunity employer committed to diversity and inclusion. We embrace individuals from all backgrounds and provide employment opportunities without regard to race, color, religion, gender, gender identity, national origin, age, disability, genetic information, marital status, sexual orientation, or veteran status. If you are ready to contribute to our success and experience your own wow moments, apply now to be part of the IMS Gear family!
ID: 20624957
También puedes buscar
También puedes buscar
Refina la ubicación de tu búsqueda