BlogPublicar vacante
Crea un CV

Buscar empleo

Limpiar filtros

Bolsa de trabajo programacion de obra tiempo completo Híbrido - OCC

2 resultados

Ordenar por: Relevancia

Relevancia

Fecha

Process Engineer (Automation Engineer in USA)

Sueldo no mostrado por la empresa

Are you ready to join a dynamic global gear technology group and be part of a company that promises to "wow your world"? IMS Gear, a leading producer of gear technologies for the automotive industry, ...

IMS Gear Georgia
CDMX

Director de producción

Sueldo no mostrado por la empresa

Agencia Creativa, líder en Diseño de Experiencias, Producción de Eventos Masivos, Corporativos y de Marketing Experiencial. buscamos talento que cuente con pasión e interés por trabajar en la industri ...

Empresa confidencial
Monterrey, N.L.
  • 1

Hace 2 días

Process Engineer (Automation Engineer in USA)

Si el reclutador te contacta podrás conocer el sueldo

IMS Gear Georgia en

Sobre el empleo

Categoría: Manufactura - Producción - Operación
Subcategoría: Manufactura
Educación mínima requerida: Universitario titulado

Detalles

Contratación:

Permanente

Horario:

Tiempo completo

Espacio de trabajo:

Híbrido

Descripción

Are you ready to join a dynamic global gear technology group and be part of a company that promises to "wow your world"? IMS Gear, a leading producer of gear technologies for the automotive industry, is seeking a talented and motivated individual to join our team as a Automation Engineer (hands-on).


About IMS Gear:

With a history spanning over 160 years, IMS Gear has consistently grown, thanks to our customer-centric approach, problem-solving expertise, and an open corporate culture with flat hierarchies. Headquartered in Donaueschingen, Germany, we operate globally with a workforce of about 3,600 employees across Europe, North America, and Asia.

 

You support our team as


Process Engineer (Automation Controls Engineer)

Reports to: Business Unit Manager


We are currently seeking a skilled Process Engineer to join our team. The ideal candidate will be responsible for debug and failure identification along with problem resolution on automated assembly lines and various other injection molding and metal processing automations. 


***Please submit your resume and application in English***

 

Job Type: Full-time, 08:00 am to 04:30pm

Work Location: In person (Gainesville, GA)

 

Responsibilities:

  • Conduct machine and process capability studies and make improvements as needed
  • Develop industrial communication connections between devices. System testing. Commissioning. Mechanical alignment of parts. PLC programmers
  • Conduct complex commissioning / acceptance of equipment and machines
  • Select released suppliers for indirect material, request and evaluate offers in coordination with supplier
  • Define process parameters and ensure adherence 
  • Create and adapt work instructions
  • Develop automation concepts, support process development for new projects, coordinate with Industrial Engineering and implement 
  • Carry out complex and constructive examinations on function, layout and design of machines and electrical installations (feasibility), select/modify components
  • Develop and carry out the construction of smaller complex process solutions
  • To program machine controls and teach robots
  • Develop and implement measures for process optimization, initiate implementation incl. new partial process solutions and modification of manufacturing processes
  • Participates in 8D problem-solving activities (internal/external), analyze complex alarms and remove root causes
  • Keep automation maintenance history up to date and ensure exchange of information in SharePoint
  • Support beyond BU-level in case of complex process changes and faults
  • Determine root causes for complaints and develop corrective actions
  • Plan spare parts requirements and initiate orders
  • Introduce employees to installations, instruct them and create training material
  • Supervision of interns and bachelor students
  • Ensure compliance with guidelines and regulations (environment according ISO14001, compliance, work safety) with company and BU-standards. 
  • Initiate process improvement projects using data-driven and statistically designed experiments to enhance quality, reduce cost, enhance safety, and increase earnings
  • Assists quality department to verify process parameters and monitor functionality of quality related devices
  • On call when required
  • Other duties as assigned

 

Education and Project Requirements: 

  • Bachelor's Degree in Engineering (Mechatronics Engineer, Electrical Engineer, Automation and Control Engineer, Mechanical Engineer Or Related.) and minimum 3+ years relevant work experience (automotive preferred)
  • Current passport desirable (even better if you have an american tourist visa)

 

Skills Requirements:

  • Manufacturing and IATF Standard experience preferred
  • Technical writing and logical hands-on problem solving skills
  • Ability to work in a team environment
  • Self-driven and motivated to learn
  • Commitment and responsibility.
  • Teamwork.
  • Ability to work under pressure.
  • Capable at reading schematics (electrical, hydraulic, pneumatic)
  • Computer Skills (MS Office)


 

Knowledge or experience with the following (desired):

  • Siemens Step 7 classic
  • Mitsubishi Scara
  • Kuka Roboter KR C4
  • Yaskawa

 

Some of your Benefits:


  • Financial and legal Support in the management of the work visa process.
  • Flight from Mexico City to final destination in the United States (depending on the location, the flight may be with a stopover) and vice versa.
  • Lodging and transportation in the United States for the first 90 days of your project.
  • 401 (k) & 401 (k) matching
  • Health, Dental, Medical, Vision insurance
  • Company Paid Life insurance
  • Company Paid Short term and Long term disability insurance
  • 15 business days of paid time-off and 10 paid holidays

 

Work Environment/Physical Demands: 

  • Exposure to manufacturing areas which require the use of personal protective equipment such as safety glasses, hearing protection and slip resistant safety toe shoes

 

IMS Gear is an equal opportunity employer committed to diversity and inclusion. We embrace individuals from all backgrounds and provide employment opportunities without regard to race, color, religion, gender, gender identity, national origin, age, disability, genetic information, marital status, sexual orientation, or veteran status. If you are ready to contribute to our success and experience your own wow moments, apply now to be part of the IMS Gear family!

 

Recuerda que ningún reclutador puede pedirte dinero a cambio de una entrevista o un puesto. Asimismo, evita realizar pagos o compartir información financiera con las empresas.

ID: 20624957

También puedes buscar

Técnico De Construcción

También puedes buscar

Técnico De Construcción

Refina la ubicación de tu búsqueda

México

Ciudad de México, México

Nuevo León, México

VER MÁS

Refina la ubicación de tu búsqueda

México

Nuevo León, México

Ciudad de México, México

Monterrey, Nuevo León, México

Candidatos
Crea un CV
Inicia sesión
Preguntas frecuentes candidatos
ios
android
Empleos por clasificación
Vacantes por Estado
Vacantes por Ciudad
Vacantes por Categoría
Vacantes más buscadas
Vacantes por Contrato
Vacantes por Empresa
Buscar empleo en México y el mundo
Empresas
Busco talento / Publicar Anuncio
Ayuda para reclutadores
Preguntas frecuentes de reclutadores
OCC
Acerca de OCC
Blog
Trabaja en OCC
Ayuda

OCC D.R. © 1996-2025 Derechos reservados. Versión del sitio candy-serp@